| Peak Hours       Mon, Wed, Fri 1800-2359 Pacific Time; Sat and Sun 1200-2359 Pacific Time |
| WRITTEN |
OTS |
GND |
D-TWR |
C-TWR |
B-TWR |
APP-1 |
APP-2 |
CTR |
| None |
None |
|
|
|
|
|
|
|
| VATUSA S1 |
GC Tower |
|
|
|
|
|
|
|
| ZLA Basic |
None |
|
|
|
|
|
|
|
| ZLA Tower |
None |
|
|
|
|
|
|
|
| ZLA Tower |
Class C |
|
|
|
|
|
|
|
| ZLA Tower |
Tower |
|
|
|
|
|
|
|
| ZLA Approach |
Tower |
|
|
|
|
|
|
|
| ZLA Approach |
Approach |
|
|
|
|
|
|
|
| ZLA Center |
Approach |
|
|
|
|
|
|
|
| ZLA Center |
Center |
|
|
|
|
|
|
|
APP-1 is defined as any single approach sector. APP-2 is defined as Socal Combined. |
| Authorized for any non Certified Tower defined in the Global Ratings Restrictions |
| Authorized after Solo Certification |
| With Solo Certification for the corresponding position |
| With Instructor/Mentor Supervision |
| Not Authorized |
If you're a new controller or transfer...
To ensure that all of our newer members are prepared to handle ground and delivery positions in the ZLA airspace, we
require that you are signed off by a mentor before you work these introductory positions. This checkout is strictly informal,
and we are only looking to verify that you know the basic functions of VRC/ASRC and have a grasp on our general procedures. If you
are looking to get signed off, feel free contact one of our mentors or instructors.